DCI builds plaster powder production lines from 20,000 to 100,000 t/y on the grinding-before-calcination route. Gypsum rock is crushed to 10–40 mm, ground to raw powder, then calcined in a boiling kiln or rotary kiln, aged and packed. Full automatic and semi-automatic control are both available on a Siemens PLC. Delivered turnkey with installation, commissioning and operator training.

Product Details

Plaster Powder Production Line 20,000–100,000 t/y

DCI builds plaster powder production lines in the 20,000–100,000 t/y range on the grinding-before-calcination route. Gypsum rock is crushed to 10–40 mm, ground to raw powder, and then calcined in either a boiling kiln or a rotary kiln. Each line is delivered turnkey: process design, equipment manufacture, installation, commissioning and operator training.

Where This Line Sits in the Range

DCI builds gypsum powder lines on three process routes, and the route follows the raw material and the product requirement. This plaster powder plant covers the compact grinding-first line. Projects above 100,000 t/y on a grinding-first route use the vertical kiln line; projects that need calcining before grinding use the calcining-first line.

Route

Process order

Capacity

This line

Crush, grind, then calcine in boiling kiln or rotary kiln

20,000–100,000 t/y

Calcining-first line

Crush, calcine in rotary kiln, age, then grind

30,000–200,000 t/y

Large grinding-first line

Crush, grind, then calcine in boiling kiln or vertical kiln

100,000–300,000 t/y

Process: Grinding Before Calcination

Gypsum rock enters the crusher and is reduced to 10–40 mm. The crushed rock is fed to a grinding mill to produce raw gypsum powder. The powder is lifted by bucket elevator to a storage silo, measured automatically and accurately by belt scale under PLC control, and fed into the calcination kiln. Heat from a hot air stove or boiler drives off the crystallisation water, converting dihydrate gypsum into hemihydrate stucco. After cooling or aging, the finished powder is packed into bags.

Grinding before calcination means the kiln receives powder of an even particle size, and the mill works on raw rock rather than on hot calcined material.

System

Function

Crushing

Reduces run-of-mine gypsum rock to 10–40 mm

Grinding

Raymond mill producing raw gypsum powder before calcination

Storage and weighing

Bucket elevator to silo, automatic measurement by belt scale with PLC control

Calcination

Boiling kiln or rotary kiln, hot air stove or boiler as heat source

Cooling and aging

Stabilises phase composition before packing

Packing

Finished stucco bagged to the customer's bag specification

Calcination: Boiling Kiln or Rotary Kiln

Two calcination systems are available on this line: the boiling kiln, also written as ebullition furnace, and the rotary kiln. The choice follows the product requirement rather than the budget alone.

System

Best suited to

Notes

Boiling kiln (ebullition furnace)

Standard building plaster, compact sites

Fluidised-bed calciner; heating medium can be thermal oil, hot air or steam; compact, low energy consumption, stable phase composition

Rotary kiln

Higher whiteness or wider feed size

Indirect combustion; accepts feed up to 30 mm; can calcine powder finer than 80 mesh

Technical Specifications

Parameter

Specification

Annual capacity

20,000–100,000 t/y (customised by configuration)

Process order

Crushing, grinding, calcination, aging, packing

Calcination system

Boiling kiln or rotary kiln

Control

Full automatic or semi-automatic, Siemens PLC

Fuel

Natural gas, diesel, coal, heavy oil

Raw material

Natural gypsum rock (CaSO4·2H2O content above 80%), FGD gypsum, phosphogypsum

Finished product

β-hemihydrate gypsum powder (β-CaSO4·1/2H2O), no admixture or additive

Quality standard

GB/T 9776-2008

Main use of powder

Gypsum board, plaster powder and putty

Technical data are taken from DCI's standard configuration for this capacity class and the product catalogue. Final configuration is confirmed against the customer's raw material analysis, fuel and site conditions.

Raw Material

The line is designed around natural gypsum rock with a CaSO4·2H2O content above 80%, conforming to the requirements of JC/T 700 for gypsum rock used in cementing materials, grade 3 or higher. FGD gypsum and phosphogypsum can also be processed; both change the feed preparation and drying stages, so the flow sheet is fixed only after the raw material is confirmed by analysis.Every gypsum factory setup is configured against that analysis rather than from a fixed list.

Scope of Supply: Buyer and Seller

The division of work below is DCI's standard split for a line of this class. The final scope is written into the supply contract.

Party

Item

Responsibility

Buyer

1.1

Machinery and tools for installation, commissioning and maintenance

Buyer

1.2

Transport equipment: two forklifts

Buyer

1.3

High-voltage power supply, substation and distribution station

Buyer

1.4

Water supply, storage and drainage system

Buyer

1.5

Civil engineering: buildings, equipment foundations including pre-buried parts, silos and pools

Buyer

1.6

Material for machine platforms and supporting frames

Buyer

1.7

Round-trip tickets and transport for the seller's workers

Buyer

1.8

Accommodation and necessary allowances for the seller's workers during installation, commissioning and training

Buyer

1.9

Large tools such as crane, forklift, welder and cutting equipment

Buyer

1.10

Assistant workers to cooperate with the seller's team as required

Buyer

1.11

Usage permission for special equipment

Seller

2.1

Production equipment

Seller

2.2

Installation guiding engineers and technical workers

Seller

2.3

One team leader and one interpreter

Seller

2.4

Foundation drawings and general arrangement drawings within 40 days of down payment

Seller

2.5

Operation manual provided during training

Seller

2.6

Assembly drawings, control cabinet wiring diagrams and PLC programs within 7 days of acceptance

Seller

2.7

Commissioning and training, including full-scale testing and handover to the buyer's operators

Seller

2.8

Free technical consultation within one year of the acceptance certificate

Commissioning and Training

DCI sends engineers and technical workers to site for full-scale testing, with the buyer supplying assistant staff to cooperate. The seller's team runs the line, explains the operation on site and answers questions from the buyer's technicians and operators. Once the buyer's workers have mastered the operating technique, the running line is handed over and training is complete.

Frequently Asked Questions

Q: What capacity can this line deliver?

A: 20,000 to 100,000 t/y, customised against the raw material and the required product.

Q: Should I choose the boiling kiln or the rotary kiln?

A: The boiling kiln suits standard building plaster and compact sites, with low energy consumption and a stable phase composition. The rotary kiln produces higher-whiteness powder and accepts a wider feed size range.

Q: What is the difference between grinding first and calcining first?

A: Grinding first gives the kiln powder of an even particle size and keeps the mill on cold raw rock. Calcining first lets the kiln take coarser rock and is used where the product calls for it. Both routes meet the same finished-powder standard.

Q: What raw material can the line process?

A: Natural gypsum rock above 80% CaSO4·2H2O, FGD gypsum and phosphogypsum. The feed preparation stages differ by material.

Q: What standard does the finished powder meet?

A: GB/T 9776-2008. DCI also confirms the finished powder against the setting-time requirement agreed in the contract.

Q: What does the buyer need to prepare?

A: Civil works and foundations, high-voltage power supply and substation, water supply and drainage, large tools and local assistant labour, plus travel and accommodation for DCI's engineers. The full list is in the contract.

Contact DCI

Send us your target capacity, raw material type and available fuel, and our engineering team will return a tailored configuration and quotation. Hengshui Decheng Machinery & Equipment Co., Ltd. (DCI) 

Email: dci@chinagypsummachine.com | WhatsApp: +86 13930110827 / +86 18203235588

| www.dcimachine.com


PRODUCTS LIST

+NEWS

Processing Demand Survey

x