Home>About Us>Main Case

Introduction Classification

Oman

Location: Salalah, Sultanate of Oman
Cooperation: Since 2006, ongoing
Line/Capacity: Gypsum Board Line (20 million m²/year), Gypsum Powder Line (180,000 tons/year),Gypsum Block Line×2 (150,000 m²/year each)
All three lines delivered, commissioned, and in production. DCI continues to supply spare parts and equipment upgrades. This remains DCI's largest single-client project in the Middle East.

Iran

Location: Iran
Cooperation: 2013 – Present
Line/Capacity: Gypsum Board Line (10 million m²/year), Gypsum Block Line (150,000 m²/year), Gypsum PVC Tile Line (Custom)
Signed 2014, installed 2015, handed over December 2016. DCI continues to supply spare parts and equipment upgrades.

Russia

Cooperation: Project completed
Line/Capacity: Gypsum Powder Line (150,000 tons/year)
Full production line delivered and commissioned. Built for local gypsum raw material, covering crushing, grinding, calcination, and packing.

Ethiopia

Cooperation: Project completed
Line/Capacity: Gypsum Powder Line (100,000 tons/year)
Turnkey delivery including installation and operator training. DCI's first project in East Africa, paving the way for regional expansion.

Processing Demand Survey

x