Gypsum Block Production Line Manufacturers,Suppliers
DCI designs and manufactures complete gypsum block production lines with capacities from 100,000 to 450,000 m²/year. Each line is custom-engineered to your block size, capacity target, and site conditions — not a pre-configured template. Delivered turnkey: design, manufacturing, installation, commissioning, and operator training.
Parameter | Specification |
Annual Capacity | 100,000 – 450,000 m² |
Block Type | Solid (DCS) or hollow (DC) |
Block Thickness | 70 – 200 mm |
Block Width | 300 – 500 mm (adjustable) |
Block Length | 620 / 666 mm |
Raw Material | Gypsum powder + water |
Drying System | Hot air stove drying |
Automation | Full automatic |
Standard | JC/T698-2010 |
Model | Block Thickness (mm) | Block Size (L×W, mm) | Type |
DCS07 | 70 | 666 × 500 | Solid core |
DCS10 | 100 | 666 × 500 | Solid core |
DC10 | 100 | 666 × 500 | Hollow core |
DC15 | 150 | 666 × 500 | Hollow core |
DC20 | 200 | 620 × 400 | Hollow core |
●Solid and hollow block options — DCS solid core for load-bearing walls, DC hollow core for lightweight partitions
●Adjustable block width — 300 to 500 mm, matched to local building standards
●In-house manufacturing — ISO 9001 certified since 2008
●Overseas commissioning — engineers stay on-site until target output
●Spare parts stocked — guaranteed supply for the full lifecycle
Project | Capacity | Location |
300,000 m²/yr block line | 300,000 m²/yr | Oman |
150,000 m²/yr block line | 150,000 m²/yr | Kyrgyzstan |
A gypsum block production line ranges from $32,000 to $1,500,000 FOB China, depending on capacity, block type, and automation level. Request a tailored quotation for your specific configuration.
Q: What block sizes can your lines produce? A: Thickness 70–200 mm, width 300–500 mm (adjustable), length 620 or 666 mm. Custom sizes available on request.
Q: What's the difference between solid and hollow blocks? A: Solid core (DCS) for structural walls; hollow core (DC) for lighter, non-load-bearing partitions and faster installation.
Q: How long does installation take? A: Typically 3–5 months from equipment arrival, depending on line size and site readiness.
Q: Can you process different gypsum raw materials? A: The block line uses finished gypsum powder, which we can also supply from our own powder lines.
Tell us your block size, target capacity, and fuel preference. We'll respond within 24 hours with a tailored proposal.
Email: dci@chinagypsummachine.com | WhatsApp: +86 13930110827 / +86 18203235588
Web: www.dcimachine.com
Processing Demand Survey
x